China Construction Eighth Engineering Division, Sichuan Nanchong West China Normal University
Public Building Floor Construction
Return to List
案例介绍

Project Background

In June 2023, the project introduced floor construction combo robots (floor grinding robot, floor coating robot).

Implemented a pilot construction of 450㎡ epoxy flooring, with a base surface grinding area of 960㎡.



Advantages of Robotic Construction

Customer Feedback: "The field operation of two smart construction robots has achieved efficient, automated, and intelligent epoxy flooring construction."


daa5a5c869da4c77ae796c5aeffe0678.png